Snapshot of October 29, 2026. This dossier describes the four repositories as they stood that day; the projects have moved on since, and the repositories are the authority. Underlined links lead to the sources, frozen at their state of that day. What came next lives on gnu6dotlive.github.io.
Timeline
A month of open workshop
From September 20 to October 29, 2026, four repositories move forward in parallel. A few days hold everything: October 7, 10 and 20. Here is the month, project by project, day by day.
The month on one timeline #
Day by day #
| Date | Repository | What happens |
|---|---|---|
| September 20 | Calix | First release, v0.1.0, still under the name Shelly. |
| October 5 | gnosix | First public repository, with a CI contract from day one. |
| October 6 | in.gnu6 | The quest log is ratified; ten milestones are ratified the same day. |
| October 7 | gnostral.rs | Quests Q-001 to Q-008 closed; versions 0.1 to 0.8 published. |
| October 7 | in.gnu6 | Six more milestones: the mandate, sixteen milestones, is complete. |
| October 8–9 | in.gnu6 | Native-rendering research (GPU-05). |
| October 9 | gnostral.rs | The partial Q-009 track is dated and kept as is. |
| October 10 | gnosix | From the GPL to the MIT licence. |
| October 10 | gnostral.rs | The native proof chain, from Q-010 to Q-013-C. |
| October 10 | in.gnu6 | The CUDA-05F protocol, a 125 s endurance run, the repository made public. |
| October 12 | gnosix | Wayland qualification: click, two screens, drag and drop. |
| October 20 | Calix | Six releases, v0.2.0 to v0.2.5: the Calix name, notifications, fixes, the mark, navigation. |
| October 21 | gnosix | First public pre-release, v26.11-rc1 « Ardoise ». |
| October 21 | Calix | v0.3.0, the release that measured space. |
| October 21 | gnostral.rs | A research watch on upstream systems. |
| October 22 | Calix | v0.3.1, the release that runs on the machine. |
| October 27 | gnosix | CI contract at 38/38 after merging the pre-release; a default desktop profile. |
| October 28 | Calix | Latest evidence before the snapshot: the release document has a single writer. |
| October 29 | prologue | This dossier's snapshot: the four repositories, checked and frozen as they stood that day. |